From August to December 2025, we completed a distributed temperature monitoring system for busducts and electrical room power equipment at Company D's new factory.
The system panel includes an eight-channel DTS system with a 10 km range and a database server. Integration with the SCADA system enables unified monitoring.
Coverage includes indoor equipment, outdoor connections between buildings and electrical room power facilities. Operation began in line with the new factory construction schedule.
Topics: DTS and distributed fiber optic temperature monitoring, IDC and busduct monitoring, power equipment, HMI and warning beacons, full 3D views and automatic Patrol.
이메일 무단수집을 거부합니다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나 그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며, 이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.