Our DTS system (DMS) for Units 7 and 8 at OO Power Generation Headquarters was completed on June 30, 2014.
The installation includes 13.7 km of dedicated fiber optic sensing cable for 345 kV cables in underground utility tunnels and power cable trays rated at 22.9 kV and 480 kV, as stated in the original article.
Part of the cable installation was changed from S-shaped routing to parallel routing to improve temperature sensing sensitivity.
이메일 무단수집을 거부합니다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나 그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며, 이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.